Australia, July 30 -- New South Wales Land and Environment Court issued text of the following judgement on June 30:
1. XYZ Services Pty Ltd (XYZ) sought development consent for the demolition of an existing dwelling house and separate garage on the existing lot (the site), the Torrens Title subdivision of that lot into two lots, and the erection of two new detached dwelling houses (one on each resulting lot), each with a swimming pool, deck, foreshore access and associated landscaping, at 1 Longview Street, Balmain. The site is zoned R1 General Residential under Inner West Local Environmental Plan 2022 (LEP). The proposed development of dwelling houses is permissible with consent in that zone. The site is also within an area identified as ...