Mumbai, Jan. 27 -- Mumbai Metropolitan Region Development Authority (MMRDA) on Tuesday provided clarification on the recent controversy surrounding an allegedly faulty design for a flyover in Mira Road. It stated that the transition from 4 lanes to 2 lanes is not a design flaw, but is based on available road width constraints and future network planning.
According to their statement, the flyover does not "suddenly narrow." As per planning, the flyover has been designed with two lanes for Bhayander East and future connecting two lanes for Bhayander West. Since the Bhayander East arm comes first along the alignment, the 4-lane configuration presently transitions into 2 lanes. The remaining two outer lanes are planned as part of the future ...
Click here to read full article from source
To read the full article or to get the complete feed from this publication, please
Contact Us.