Bhubaneswar, June 22 -- https://images.odishatv.in/uploadimage/library/16_9/16_9_0/rr_1750588480.webp
A temporary but crucial diversion road near the Banspal bridge construction site in Keonjhar district was washed away last night due to heavy rain, severing connectivity to the national highway (NH-49) from Telkoi block, sources said on Sunday.
Stranded vehicles and residents now await urgent administrative intervention.
According to the sources, a diversion road built for the under-construction Banspal bridge on Kanjipani-Kantala Works Department road has been washed away by last night's heavy rainfall. As a result, the vital road connectivity from Telkoi to NH-49 has been completely disrupted.
Locals alleged that the road has been und...