Panchkula, Feb. 3 -- After receiving an inadequate response to the tender floated in December 2025, the Panchkula Metropolitan Development Authority (PMDA) has issued a fresh tender for the construction of a world-class shooting range, estimated to come up at a cost of Rs.133.56 crore. The foundation stone was laid by chief minister Nayab Singh Saini in August 2024. A senior PMDA official associated with the project said that only a limited number of bids were received earlier, leading the authority to re-invite tenders in order to attract a suitable agency. Once the contract is awarded, the construction is expected to be completed within two years. The shooting range complex will be developed over around 9.20 acres in Sector 32. It will have a total spectator seating capacity of around 1,700 across the Final Range and the 50-metre, 25-metre and 10-metre shooting ranges. The ground-plus-two-storey building will house the 50-metre, 25-metre and Final shooting ranges on the ground floor, while the 10-metre shooting range will be located on the first floor. The project includes provisions for modern internal and external infrastructure such as lifts, electrical substations, a building management system (BMS), CCTV surveillance and access control systems, electronic private automatic branch exchange (EPABX), server rooms, fire detection and firefighting systems, heating, ventilation, and air conditioning (HVAC), mechanical ventilation and renewable energy systems.HTC...