Exclusive

Publication

Byline

AYSHA RAISA ENTERPRISE secures contract for Repair and maintenance works by bamboo piling at left dyke of I-3 S-1 irrigation canal km. 0.675 to km. 0.695 = 20.00m, km. 2.300 to km. 2.340 = 30.00m and at left dyke of I-3 S-1 T-3 irrigation canal km. 0.030 to km. 0.050 = 20.00m, Total 70.00m in connection with PIRDP under Bera WD Division, BWDB, Bera, Pabna during the FY 2025-2026.

Bangladesh, Aug. 14 -- Bangladesh based AYSHA RAISA ENTERPRISE has secured contract from Bangladesh Water Development Board (BWDB) for Repair and maintenance works by bamboo piling at left dyke of I-3... Read More


SIFAT ENTERPRISE secures contract for Dismantling of shore pipeline and outline, reccured the pipe line from under ground and same on river bank including loading the same on pipe barge at different shole of Aricha-Kazirhat-Bagabari river route.

Bangladesh, Aug. 14 -- Bangladesh based SIFAT ENTERPRISE has secured contract from Bangladesh Inland Water transport Authority (BIWTA) for Dismantling of shore pipeline and outline, reccured the pipe ... Read More


Big Machinery Robert Bednarz secures contract for Construction work - Design and implementation of small retention tasks for the needs of the Jamy Forest District

Poland, Aug. 14 -- Poland based Big Machinery Robert Bednarz has secured contract from Nadlesnictwo Jamy for Construction work - Design and implementation of small retention tasks for the needs of the... Read More


Linde Gas a.s. secures contract for Chemical products - Plyny (kategorie C) - 2025

Czechia, Aug. 14 -- Czechia based Linde Gas a.s. has secured contract from Ustav organicke chemie a biochemie AV CR, v. v. i. for Chemical products - Plyny (kategorie C) - 2025 . The value of the cont... Read More


Bizli Enterprise secures contract for (1) Construction of CC Road from Sultanpur Mathpara Habib House to Masuma House (Ch 0.00-28.00) at Ward No-01, Under Mirpur Pourashava, Kushtia. (2) Construction of CC Road from Sultanpure Ashik House to Miraj House (Ch 0.00-28.00) at Ward No-01, Under Mirpur Pourashava, Kushtia. (3) Construction of Brick Wall with RCC Post Palisading at Sultanpur in front Late Biddut House at Ward No-1,under Mirpur Pourashava, Kushtia. Ch 00-25.00m (4) Construction of CC Road from Koripol Monir House to Abdus Sattar House (Ch 0.00-52.00) at Ward No-02, Under Mirpur Pourashava, Kushtia.

Bangladesh, Aug. 14 -- Bangladesh based Bizli Enterprise has secured contract from Mirpur Paurashava for (1) Construction of CC Road from Sultanpur Mathpara Habib House to Masuma House (Ch 0.00-28.00)... Read More


Samodzielny Publiczny Zespol Opieki Zdrowotnej w Lesku secures contract for Hospital and related services - Supplementary SOP tender competition - ZOL p leski

Poland, Aug. 14 -- Poland based Samodzielny Publiczny Zespol Opieki Zdrowotnej w Lesku has secured contract from Podkarpacki Oddzial Wojewodzki Narodowego Funduszu Zdrowia for Hospital and related ser... Read More


IMRAN ENTERPRISE secures contract for Tree Plantation of Mostafar More RHD- Rajbandh-Kaiya GC road (Dumuria Portion) from Ch. 700.0-3200.0m, Road ID: 247302008, Under Upazila: Dumuria, Dist: Khulna.

Bangladesh, Aug. 14 -- Bangladesh based IMRAN ENTERPRISE has secured contract from Local Government Engineering Department (LGED) for Tree Plantation of Mostafar More RHD- Rajbandh-Kaiya GC road (Dumu... Read More


M/S ALI ENTERPRISE secures contract for Installation of 04 Nos 100x38 mm dia Tube-well with Sub-mersible Pump at different Upazila of Shariatpur District under Revenue Budget during the FY- 2025-26

Bangladesh, Aug. 14 -- Bangladesh based M/S ALI ENTERPRISE has secured contract from Department of Public Health Engineering (DPHE) for Installation of 04 Nos 100x38 mm dia Tube-well with Sub-mersible... Read More


Md. Nur Hossain secures contract for Bathymetric Survey work along the Right Bank of Padma River at Barokandi area from km (-) 11.330 to km (-) 16.000 = 4.67 Km in connection with "River Bank Protection along the Right Bank of Padma River at Majirghat Zero point area of Zajira Upazila in Shariatpur District (1st Revised)" project under Shariatpur WD Division, BWDB, Shariatpur during the year 2025-26

Bangladesh, Aug. 14 -- Bangladesh based Md. Nur Hossain has secured contract from Bangladesh Water Development Board (BWDB) for Bathymetric Survey work along the Right Bank of Padma River at Barokandi... Read More


L3HARRIS MARITIME POWER & ENERGY SOLUTIONS, INC secures contract for Rectifier,Semicondu, In Repair/Modification Of

United States, Aug. 14 -- United States based L3HARRIS MARITIME POWER & ENERGY SOLUTIONS, INC has secured contract from Dept Of Defense for Rectifier,Semicondu, In Repair/Modification Of . The val... Read More